Open Country Dairy’s Waharoa Wastewater Treatment Plant upgrade

The OCD Waharoa WWTP upgrade also includes 375kW of Aqua Turbo Floating Surface Aerators manufactured to Aeris Global specifications. The worlds most efficient high-speed surface aerator is specified with the exceptional WEG W22 Premium Efficiency Electric Motor ensuring every hour of operation delivers optimum results. We are proud to have been part of the solution on this project alongside the great team at BPO.

Stuff article