Cambridge Wastewater Treatment Plant’s Aeration Upgrade Project

Aeris Global is proud to have been awarded the Cambridge Wastewater Treatment Plant’s Aeration upgrade project. The project is the second for Waipa District Council having recently completed the aeration upgrade at Te Awamutu Wastewater Treatment Plant.

The Cambridge project includes a full package of Aeris Global® equipment including six Aqua Turbo® Floating Surface Aerators; AerisAnchor® – Multi-function Mooring System; AerCable® – Cable Management System and two OtterDock® – Safe Docking Platforms.

Each OtterDock® allows the retrieval of three aerators without maintenance personnel leaving the safety of the platform. All power cables are routed under the OtterDock® using purpose-designed cable trays. Aeris Global Field Services will also install and commission the system in association with Main Contractor, Fulton Hogan.